Planner NEC Programming and Delay Analysis

Ref
MAX10918
Consultant
Steve Thomas
Region
London
Location
London
Salary
£80,000 to £85,000
Job Posted
18/11/2026
Type
Permanent
Status
Live: Interviewing now

A remote-based Planner opportunity, to be based within reach of London, rebuilding and revising NEC programmes for contractors on power, water, road and rail infrastructure projects, assessing compensation events and developing delay analysis skills with a specialist planning and delay consultancy.

Project Details

The Planner will work on a range of UK infrastructure projects for contractor clients, with a focus on power, water, road and rail.

These may include electricity transmission and distribution networks, substations and energy generation schemes; water and wastewater treatment works, pipelines and pumping stations; highways schemes, junction improvements and bridges; and rail infrastructure, including track, stations, structures and signalling-related civil engineering works.

Many of these projects are delivered under NEC contracts, where accurate, well-maintained programmes are central to managing time, cost and change, and to delivering projects on time and on budget.

Responsibilities and Duties

This Planner position combines live project planning with programme analysis and delay work for contractors operating under NEC contracts. The successful Planner will rebuild programmes, explain to contractors how their programmes need to change, and help them manage the time effects of change. For candidates new to delay analysis, training will be available. Key responsibilities include:

  • Rebuilding contractor programmes from scratch in Primavera P6, with sound logic, sequencing and a clear critical path
  • Reviewing existing programmes and advising contractors on the changes needed to make them compliant, realistic and acceptable to the Project Manager
  • Preparing and revising NEC Clause 32 programmes, showing actual progress, the effects of implemented compensation events, early warning matters, and how the contractor plans to deal with delays
  • Making sure programmes include everything required under Clause 31, such as the Completion Date, planned Completion, Key Dates, float, time risk allowances and the order and timing of the works
  • Preparing the programme elements of compensation event quotations, showing how each change affects planned Completion and Key Dates
  • Assessing how changes, early warnings and compensation events affect the programme and the critical path
  • Carrying out, or learning to carry out, delay analysis using recognised methods such as time impact analysis, windows analysis and as-planned versus as-built analysis
  • Preparing clear programme narratives and reports for contractors
  • Working closely with contractors' project teams to understand the project, the construction methods and the logic behind the programme

Desired Skills and Experience

The client is looking for an experienced Planner who understands how projects are built as well as how they are programmed. Candidates with a site or project background will be particularly suitable.

A strong understanding of NEC programme requirements is essential. Under the NEC Engineering and Construction Contract, the Accepted Programme is the main tool for managing time and change. Its quality directly affects how compensation events are assessed and whether a contractor can recover time and money.

A contractor whose programme has not been accepted is at a disadvantage when compensation events are assessed, and under the NEC4 ECC a proportion of payment can be retained until a compliant first programme has been submitted.

The ideal candidate will have:

  • 4 to 6 years' experience working in a live planning role on construction or infrastructure projects
  • Essential experience of NEC3 and/or NEC4 contracts, including preparing and revising Clause 31 and Clause 32 programmes and understanding the Project Manager's acceptance process
  • A good understanding of compensation events, including how their time effects are assessed against the Accepted Programme
  • The ability to rebuild programmes from scratch and fully understand the project, the construction sequence and the programme logic
  • A clear understanding of how changes affect the programme, the critical path, float and Completion
  • Delay analysis experience, or a strong interest in being trained in delay analysis
  • Essential: strong skills in Primavera P6
  • Desirable: familiarity with Asta Powerproject
  • Ideally, previous experience as a Project Manager, Assistant Project Manager, Site Agent, Site Engineer or Project Engineer
  • Infrastructure experience, particularly in power, water, highways or rail, would be an advantage

 

Qualifications/Educational Requirements

Qualifications are not specified, but the following would be an advantage:

  • A degree in Civil Engineering, Construction Management or a related subject
  • Membership of a relevant professional body, such as the CIOB, ICE or APM, or the PMI Scheduling Professional (PMI-SP) credential
  • NEC training or accreditation, such as NEC4 ECC Project Manager or Supervisor accreditation

Employing Company Overview and Profile

Maxim Recruitment, a specialist construction recruitment agency, is seeking a Planner on behalf of its client, a multidisciplinary construction and engineering consultancy with UK offices including London. The client's delay and programme services include project planning, forensic delay analysis, delay claim preparation and disruption analysis.

These sit alongside commercial and contract management, dispute resolution and delay and quantum expert witness services. It works across building, civil engineering and infrastructure, renewables and power generation, and other complex sectors. Its experienced consultants deliver a tailored service to suit each client's needs, and the firm also provides training in project planning and delay analysis.

A full client overview will be given to shortlisted candidates.

Additional Benefits Package and Incentives

  • Salary: £80,000 to £85,000 per annum
  • Remote working, ideally from a location within reach of London

Recommend this job to a friend

and get a £500-£1000 cash reward for successful matches.

Recommend a friend