76 Quantum Delay Claims and Dispute jobs in London
London Quantum Delay Claims and Dispute Keywords: claims Page 3 of 8 « 1 2 3 4 5 ... 8 »-
An exciting Quantum Director job in the construction sector to join a large multidisciplinary consultancy in their London office.
Read more » -
A Quantum Associate Director role within the project advisory and disputes division of one of the most reputable expert firms operating in London and internationally.
Read more » -
A Quantum Expert/ Director role within the project advisory and disputes division of one of the most reputable expert firms operating in London and internationally.
Read more » -
An exciting opportunity has become available for a Quantity Surveyor to join a highly regarded and established multidisciplinary consultancy based in Central London. This dynamic firm specialises in delivering a wide range of services, including cost and commercial management, planning, dispute resolution, and expert witness expertise.
Read more » -
A fantastic opportunity for a Associate Director in Quantum to join within the Quantum division of an international and prestigious expert witness consultancy headquartered in Central London.
Read more » -
If you’re an experienced Disputes professional with strong exposure to Quantum-related expert work and would like to work closely with industry-leading experts on high-profile, international disputes with one of the best consultancies in the world; then this could be a fantastic career move for you.
Read more » -
Associate Director Forensic Planning job vacancy in the construction sector to join a large multidisciplinary consultancy in their London office.
Read more » -
Senior Chartered Building Surveyor Expert Witness role focused on defect analysis and construction disputes.
Read more » -
A great opportunity for a Quantum Consultant to support expert witness work on major construction disputes in London (hybrid/remote).
Read more » -
An excellent opportunity for a Senior Quantum Consultant to support expert witness commissions on major construction disputes, based in London (hybrid/remote).
Read more »