46 Quantum Delay Claims and Dispute jobs in London
London Quantum Delay Claims and Dispute £60,000 to £149,999 Construction Disputes Page 4 of 5 « 1 2 3 4 5 »-
An exciting opportunity for an engineer to move into construction disputes as a Senior Associate within the Delay division of a prestigious, central London based expert witness consultancy.
Read more » -
An exciting opportunity for an engineer to move into construction disputes as a Senior Associate within the Delay division of a prestigious, central London based expert witness consultancy.
Read more » -
A London based claims and disputes consultancy searching for an entry level Dispute Resolution Consultant to join their growing team and work on Delay matters in the Construction Industry.
Read more » -
An established, London based claims and dispute resolution consultancy is seeking a Senior Quantum Consultant who can carry out claims and quantum analysis.
Read more » -
A Senior Delay Analyst role exists for a construction planner with strong exposure to delay analysis. The position is to work within a specialist claims and disputes consultancy based in central London.
Read more » -
An exciting opportunity for an experienced planner to specialise in Delay Analysis with a specialist claims and disputes consultancy based in London.
Read more » -
Delay Managing Consultant job-based in London/ Hybrid to work with Delay Experts on a range of high value projects that are working through the dispute process and may result in arbitration.
Read more » -
Quantum Managing Consultant job in London to work with Quantum Experts on a range of high value international projects that are heading towards resolution through the process of arbitration or litigation
Read more » -
An exciting Senior Delay Consultant job located in central London. You will work within the specialist claims and disputes division of a large multinational consultancy.
Read more » -
Associate Director Forensic Planning job vacancy in the construction sector to join a large multidisciplinary consultancy in their London office.
Read more »