39 Quantum Delay Claims and Dispute jobs
Quantum Delay Claims and Dispute Keywords: construction Up to £59,999 Page 3 of 4 « 1 2 3 4 »-
An exciting opportunity to move into the Expert Witness sector in the role of Senior Consultant (Quantum) exists for a Chartered Quantity Surveyor with an analytical and methodical mind and a passion to work in construction disputes.
Read more » -
A role exists for a Quantity Surveyor and Dispute Resolution Consultant to work within a specialist commercial and contract management consultancy based in Darlington in the North East.
Read more » -
An entry-level Delay Analysis role exists in central London. You will work within the specialist claims and disputes division of a large multinational consultancy.
Read more » -
Our client is a bespoke, London based claims and disputes consultancy searching for a Senior Consultant level Delay Analyst to join their growing team.
Read more » -
Our client is a bespoke, London based claims and disputes consultancy searching for an entry level Delay Analyst to join their growing team.
Read more » -
This is a fantastic opportunity for a Planner to move into a Delay Analyst role with the specialist claims and disputes division on a leading consultancy, based in Birmingham.
Read more » -
This is a fantastic opportunity for a Planner to move into a Delay Analyst role with the specialist claims and disputes division on a leading consultancy, based in Manchester.
Read more » -
This is a fantastic opportunity for a Planner to move into a Delay Analyst role with the specialist claims and disputes division on a leading consultancy, based in Leeds, Yorkshire.
Read more » -
A highly regarded claims and disputes consultancy is looking for a Claims Writer to act as No 2 to our client's Commercial Manager.
Read more » -
A highly regarded claims and disputes consultancy is looking for a Claims Engineer or Claims QS with some previous claims experience to join their team. They can provide excellent training and offer a competitive salary package.
Read more »