83 Quantum Delay Claims and Dispute jobs in London
London Quantum Delay Claims and Dispute Keywords: senior quantity surveyor Construction Disputes Page 8 of 9 « 1 ... 5 6 7 8 9 »-
A Director is required to join the Quantum Analysis team of a premium, renowned Construction Expert Witness consultancy in their London office. The successful candidate will be acting as the lead assistant to the primary Quantum Experts.
Read more » -
A Director is required to join the Quantum team of a premium, renowned Construction Expert Witness consultancy to be based in their London office. The successful candidate will be acting as the lead assistant to the primary Quantum Expert.
Read more » -
Quantum Managing Consultant job in London to work with Quantum Experts on a range of high value international projects that are heading towards resolution through the process of arbitration or litigation
Read more » -
An exciting Senior Quantum Consultant job vacancy in the construction sector to join a large multidisciplinary consultancy in their Central London office.
Read more » -
An exciting Quantum Consultant job vacancy in the construction sector to join a large multidisciplinary consultancy in their London office.
Read more » -
An exciting opportunity to join a leading international construction disputes and expert witness consultancy in an entry level Quantum Consultant job role.
Read more » -
A specialist construction expert witness consultancy based in central London is searching for a bright, chartered Quantity Surveyor to support the lead testifying expert with quantum analysis on disputes that are preparing for arbitration and litigation.
Read more » -
Quantum Expert Witness job within a specialist construction disputes company based in London.
Read more » -
A Senior Delay Analyst / Forensic Planner role exists with an exciting construction disputes consultancy based in London.
Read more » -
For an expert witness consultancy.
Read more »