80 Quantum Delay Claims and Dispute jobs
Quantum Delay Claims and Dispute Keywords: water sector £60,000 to £149,999 Page 4 of 8 « 1 2 3 4 5 ... 8 »-
An excellent opportunity for an experienced Quantity Surveyor or Quantum Consultant to join a leading, specialist claims and disputes consultancy as a Senior Consultant, working on complex and high-value construction disputes. Although the consultancy is based in Central London, they are happy to consider suitable applicants based in Manchester to work remotely, with occasional travel to the London office.
Read more » -
An excellent opportunity for an experienced Delay Analyst to join a growing, specialist claims and disputes consultancy.Although the consultancy is based in Central London, they are happy to consider suitable applicants based in Manchester to work remotely with occasional travel to the London office.
Read more » -
An excellent opportunity for an experienced Quantity Surveyor or Quantum Consultant to join a leading, specialist claims and disputes consultancy as a Senior Consultant, working on complex and high-value construction disputes.
Read more » -
A fantastic opportunity for a Quantity Surveyor to specialise in a Quantum Consultant role for a London-based claims and disputes consultancy.
Read more » -
Exciting opportunity for a Delay Associate Director to join a leading construction disputes consultancy offering flexible remote work across the UK.
Read more » -
A fantastic opportunity for a Delay Analyst to join an expanding, specialist claims and disputes consultancy.This is a remote position, and the Delay Analyst can be based anywhere Europe.
Read more » -
A fantastic opportunity for a Delay Analyst to join an expanding, specialist claims and disputes consultancy.This is a remote position, and the Delay Analyst can be based anywhere in the UK.
Read more » -
A fantastic opportunity for a Senior Claims Consultant to join one of the UK’s largest multidisciplinary engineering business to work on claims and disputes in-house at their head office in Hull.
Read more » -
A new Associate Quantum Director job in the construction sector to join a premium and large multidisciplinary consultancy in their Edinburgh office (hybrid-working).
Read more » -
A new Associate Quantum Director job in the construction sector to join a premium and large multidisciplinary consultancy in their Glasgow office (hybrid-working).
Read more »